An innovative approach to building...
Hyem Frames is a high-performance timber frame system that features composite engineered studwork with integral wood fibre insulation, reducing thermal bridging and improving thermal performance. The sysyem has been developed through a combination of architectural thinking and practical construction experience.
We work with architects, developers, and contractors to deliver better building fabric—reducing complexity on site while improving thermal performance, build quality, and programme certainty.
Integrated Perfomance
Structure, insulation, and airtightness are designed as a single system rather than separate layers. We can reach U-values as low as 0.13W/(m2K) within a single wall or roof system.
Efficient Construction
Panelised manufacture reduces on-site labour, minimises material waste and simplifies sequencing.
Engineered Stability
Composite 'Ecobox' timber studs reduce movement and improve long-term performance
Our Collaborative
Design and Manufacturing Process
Our approach combines design coordination with offsite manufacturing, ensuring the timber frame system is not only well designed, but also practical to deliver on site.
We work closely with architects, developers, and contractors to align performance, buildability, and programme from the outset—reducing risk and improving overall project outcomes.
Initial Consultation
01
We begin with a review of your project, drawings, and objectives.
This stage focuses on understanding; architectural intent, performance targets, programme and budget considerations. Early input allows us to identify opportunities to improve buildability and integrate the system efficiently within the design.
Design & Proposal
02
We develop a coordinated timber frame proposal aligned with your project.
This typically includes; system selection, indicative wall and roof build-ups, performance considerations, coordination with architectural drawings. Proposals are presented as refinements, supporting the design rather than redefining it, helping to enhance performance, simplify construction, and improve delivery certainty.
Manufacturing
03
Once the design is agreed, the system is produced as a panelised timber frame under controlled factory conditions. This allows for: improved accuracy and consistency, integrated insulation within the structural zone, reduced material waste, better quality control compared to site-built methods
The result is a coordinated system ready for efficient installation.
Installation
Panels are delivered to site in sequence and installed as a coordinated package. We can provide installation directly or work alongside your contractor team, depending on the project structure.
04
Let's design your timber frame
Reach out today for a consultation and discover our innovative system.